SHANGHAI, NOVEMBER
2006
GBP
1.00 = CNY 14.5
XingYang Brickworks Railway
Early mist, then faint
sun.
13 – 20degC
I opted for a re-visit to XingYang. My
first trip in Mar 03 found the railway not working. My second attempt in Mar 05 was aborted
when the railway was telephoned and they informed my office that they had an
extended closure around the Chinese New Year. This visit, my third attempt, had to be
blind because the railway’s telephone number was unobtainable - it transpired
that all
Flew
Unfortunately, #07 was slightly warm
on the outside siding coupled to a flat wagon and another loco (presumably #207)
was inside the locked workshops.
The track between the shed and the brickworks was blocked by concrete
sleepers to protect the concrete of the new level crossing. Both rakes of empty tippler wagons were
at the other end of the railway, at the newer loading point on the western side
of the line and their wheels were rusty; however, the track nearer the road
tunnel appeared used and there was evidence of some superficial re-ballasting.
My guess is that laying the concrete
level crossing over the new road caused the railway to stop transporting clay
but they took the opportunity to carry out track improvements. The workshop gatekeeper said that the
railway would resume at 0700 on Monday but I could not find out whether the
operation would be one flat wagon for re-ballasting or full clay
trains.
Thus, Plan C was put into operation
which necessitated checking-out of the
Pingdingshan
Hazy sun.
SY 1209,
1687
JS 6225 (overhaul),
6253, 6421, 6429, 6786, 8030 (overhaul), 8031, 8054, 8057, 8062, 8065, 8068,
8120, 8122, 8338, 8421
QJ 6450, 6539 oou, 6813 oou
Diesels 0003, 0006, 0020, 0021, 0087, 0088,
5121
Saturday
pm
Hotel car for 4h @
Y150. Shed at ZhongKu accessed through main gate without problems, then
Tianzhuang yard, QiLIDian
and Mine 13. Train #306 dep Mine 13 at 1700 behind SY1209 at last light. Only chimney first photo was crossing
the river bridge but is heavily downhill, as most of the branch appears to
be. Train beat the car to QiLiDian where JS+empties and
JS+fulls were waiting.
Sunday
Was refused access to ZhongKu shed through the main gate but there was no problem
down the track from Tianzhuang yard. The yard was relatively empty by 0730
but refilled again after 0800.
JS6225 and 8030 were in the works – 6225 had the superheater removed and for boiler work and 8030 was fully
stripped.
JS8068 on #105 Psr. The washery adjacent to Tianzhuang yard was shunted by JS & 0088 on fulls/empties
Zhalainouer
I did investigate the potential for
a long weekend visit to Zhalainouer. Flights from
Internal
flights
It is always difficult to find
accurate and up-to-date timetables for internal flights in
G Howell
23/11/06